
Documentation That Wins Claims.
Every Time.
Xactimate Level 3 scopes, IICRC-compliant moisture logs, chain of custody maintained from day one — we speak your language.
We mitigate since we are on the phone.
What Creates Friction Between Vendors and Adjusters
Documentation Gaps
The problem: Missing moisture logs, incomplete photo documentation, no psychrometric data. The claim file goes to review and the adjuster can't defend the scope. Now it's a supplement fight — and the vendor who caused the gap is long gone.
How DRR solves it: Every DRR project produces IICRC S500/S520-compliant documentation: daily moisture readings with calibrated meters, psychrometric logs, thermal imaging, photo documentation at every phase, and a close-out package built for adjuster review. From day one to the day the project is completed.
Scope Disputes
The problem: Inflated line items, vague descriptions, scope that doesn't match the actual field conditions. The adjuster pushes back, the insured gets frustrated, and the TPA takes the call asking why this vendor was assigned in the first place.
How DRR solves it: Xactimate Level 3 certified estimating. Every line item tied to field documentation. Scope matches conditions — no inflation, no ambiguity. Our estimates are built to survive adjuster review because they reflect exactly what happened and exactly what was done.
Vendor Accountability
The problem: The vendor sends a subcontractor who sends another subcontractor. Nobody knows who's on-site, who's responsible for the work quality, or who to call when something goes wrong. Chain of custody breaks down. Liability becomes unclear.
How DRR solves it: DRR employees only. One project manager assigned to the loss. One direct phone number. Background-checked, credentialed, uniformed crews — every visit. We maintain chain of custody from initial response through final walkthrough. No subcontractor chains. No finger-pointing.

Claims Closed. Documentation Defended.
Category 3 Water Loss — TPA Managed
Category 3 water loss affecting multiple floors of an occupied commercial building. Managed through TPA network. DRR mobilized within hours, established containment, and executed full mitigation with daily progress reporting. Over $254,000 in contents documented, catalogued, and restored. Complete Xactimate Level 3 scope documentation provided. Zero scope disputes.
References available upon request.
Municipal Sports Facility Water Loss
Emergency water loss at a municipal ballpark facility. Rapid-response mobilization, structural drying with full psychrometric documentation, completed on schedule. Paid July 2025. Clean file — no supplements required.
References available upon request.
Verification & Registration Numbers
Preferred Vendor — Ready to Deploy

Ready to add a vendor who
makes your job easier?
From day one to the day the project is completed. Clean documentation, defensible scopes, one point of contact.
AZ ROC #349012 · Xactimate L3 · IICRC · SAM.gov: JC2UG98VRSA9

